Slide 1 of 1. This revision addresses substantive changes to Clause 5, 10 and 11 This revision addresses substantive changes to Clause 5, Clause 10, and Clause 11 of IEEE Std C57.12.91-2001 to reflect current practice in the testing procedures of dry-type transformers. Up to size 500KVA transformer is called Distribution transformer. Stay up-to-date on events, transformer best-practices, industry news, and special offers from Maddox. ) (Section 3.311). As the title indicates, the purpose of this test is to determine the quality of the insulation on a piece of electrical equipment. 800-99AETCO | Phone: 781-821-0121 | Fax: 781-821-0771, Copyright document.write(new Date().getFullYear()) American Electrical Testing Co. LLC. Switch off the Supply and repeat the test again by applying the voltage in 1V & 1W and Measure the corresponding voltage for 1U-1V, 1V1W & 1U1W. With regular testing and commissioning, dry type transformers can provide long-term service and enhance the stability and reliability of the power distribution network. If you have the transformer in a dry, clean space, you may only need annual maintenance checks. current that circulates through the shorted turns. Ensure the tap Changer in lowest tap Position. JOB NUMBER 4. An example of a 1:1 ratio would be where the input and output voltages are the same (for every 1 turn on the primary winding, you would have 1 corresponding turn on the secondary). Dry-type transformers, also known as cast resin transformers, have become increasingly popular in recent years due to their environmentally friendly and maintenance-free characteristics. With key experience in the testing and commissioning of GIS switchgears, power transformers, protection and control systems . We are the leading medium voltage transformer service company and are on call to offer you emergency and standard services and repairs for your unit. With all that being said, you are correct that the majority of NB DFR/1 Hz/ITC insulation . The clearance around the transformer should also be sufficient to allow for adequate air circulation and maintenance access. However, the presence of dust indicates that the transformer is in a dusty area that will requireinspections every three to six months. Also, just like the filters in your HVAC units, these filtersmustbe replaced regularly so as not to clog up and restrict air flow into the enclosure in order to help circulate cooler air and exhaust the warmer air. For a dielectric absorption test,conduct it for 10 minutesfrom windings to windings as well as the winding to the ground. Lets say for the sake of this example that when you applied a voltage across H1 and H2, you instead found the corresponding voltage across X2 and X3 on the low winding. encapsulated winding dry-type transformer. Find out how Maddox can power on your next project. Tests conducted at the factory; . Copyright 2021 IEEE All rights reserved. For this reason, insulation resistance tests for transformers should be treated as supplementary to the battery of standard routine tests outlined under IEEE C57.12.00, and not the be-all and end-all of determining a good transformer from a bad one. This standard describes methods for performing tests specified in IEEE Std C.57.12.01 and other referenced standards applicable to dry-type distribution and power transformers, with a voltage of 601 V or higher in the highest voltage winding. . Various types of different tests are conducted on these transformers to confirm their adherence to the specifications, and the claimed performance., which are classified into two classes- A) Transformer Tests done by the Manufacturer transformer when all other windings are open-circuited. They raise the voltage of the electricity generated at a power plant to the high levels needed to transmit the electricity efficiently. First, clean any dust or dirt from the cooling fans and windings. For this reason, IEEE allows a certain tolerance for specified losses. All electrical connections should be made according to the manufacturer's instructions and local electrical codes. The purpose of this test is to analyze a transformer's ability to withstand large voltage surges, as would be common in a typical electrical system. To reflect current practice in the testing procedures of dry-type transformers, substantive changes to Clause 5, Clause 7, Clause 10, Clause 11, and Clause 13 of IEEE Std C57.12.91-2011 have been made in this revision. Academia.edu no longer supports Internet Explorer. Oil pressure test to check for leakage on joints and gasket on the transformer. thoroughly clean all the bushings with clean cotton cloth, if, required using Carbon Tetrachloride. This transformer is disconnected during, which the core and windings are not immersed in an, insulating liquid. The voltage is adjusted to the specified value as. Field testing conditions: testing should never be conducted when the tank is under vacuum; the dielectric strength of the insulating material is severely reduced under negative pressure (IEEE Std 62-1995, p.6, section 5.3.4). For Um < 72.5 KV, ASCD test is carried out without partial, discharge measurements for 60 secs. If the tap changer is Off load type, switch of the power supply and rise one step and apply the Three phase 415 V AC across the Secondary termination and measure the voltage at both Secondary and Primary side. IEEE tolerances for quoted losses: sometimes, the specified no-load and load loss values may be slightly lower than the actual tested values after production on new transformers. Cloudflare Ray ID: 7d1aa0591b4369f0 The test code laid out in IEEE C57.12.90 also notes the difficulty and potential problems associated with attempting to establish absolute values to apply across the board for this test on distribution class transformers (See Notes 1, 2 & 3 of Table 4, IEEE C57.12.90-2021, p. 67). The applied potential test is currently not part of the standard battery of tests for reconditioned transformers. Dry-type Transformers | 2021 TESTING & ASSESSMENT . Required tools for transformer testing & commissioning. Power Transformer Tests These tests include winding insulation resistance test, winding resistance test, vector group test, tan delta test, no-load test or iron losses, load test or copper losses, temperature rise test, partial discharge test, frequency response analysis test, and transformer oil breakdown test. This standard is intended for use as a basis for performance, safety, and the proper testing of dry-type distribution and power transformers. Where defective equipment is found it will be reported to Consultant for further action. reading continues to, increase initially and for comparison purpose, reading is to, value is dependent on temperature. Use this routine dry type transformer maintenance checklist to reduce the time wasted on unnecessary repairs while improving your equipment's operation. Second, tighten all accessible hardware and replace any loose insulation or parts. The purpose of this test is to ensure the integrity of the insulation system in a given unit by putting the insulation under short-term stress via an overvoltage. Address 2: Xinggongdadao, Wangcheng District, Changsha city, Hunan Province, China. Liquid and dry type transformer testing; Very low frequency (VLF) testing; . Any such. indication should be carefully investigated by observations, In this test, twice of the primary voltage and frequency given, on LV side to verify the AC withstand strength of each line, terminal and its connected windings to earth and other, windings, the withstand strength between phases and along, AC Short duration (ACSD) test is intended to verify the AC, withstand strength of each line terminal and its connected, windings to earth and other windings, the withstands. Testing of the transformer's protective devices, such as overcurrent and overtemperature relays. For pad-mounted distribution transformers, these are one reduced wave and one full wave. Click to reveal Instead, contact a professional who has access to the latest testing equipment for this service. Applied AC voltage shall be as nearly, as possible sinusoidal and its frequency is sufficiently above, the rated frequency to avoid excessive magnetizing current, during test. It is a routine test per IEEE C57.12.00, and applied potential is performed on all new factory-built Maddox transformers. Testing will commence only after the equipment is completely installed as per approved method statement for the installation of the Transformer and released for testing commissioning. Testing includes Insulation Resistance, Turns Ratio, Power Factor, Excitation, Winding Resistance, SFRA, Leakage Reactance and Oil Analysis. Examples of changes include replacing a complete transformer (retrofitting) or replacement of the fluid only (retrofilling) . The winding being tested, shall have all its parts joined together and connected to the, ground and to the other terminal of the testing tr, The test shall be commenced at a voltage not greater than, one-third of the full value and be brought up gradually to full, value in not more than 15 s. After being held for the, specified time of 60 seconds, it should be reduced to one. & L.V. Pre-Commissioning Test: Prior to energizing the, transformer, several pre-commissioning tests are done. PRE-COMMISIONING TESTS Distribution transformers are used to step down the Following tests are done on the transformer to pre- distribution voltage to a standard service voltage or from determined standards. side. These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group. If either situation occurs, let us at ELSCO help you with service or a new medium voltage dry type transformer. For specified losses, the no-load losses may not exceed 10%, and the total losses may not go above 6% (IEEE C57.12.00-2021, p.62, 9.3). Ensure service area/work area openings are provided with barricade, tape, and safety nets. Hold the sensing probes across the conduct between which the contact resistance is to be measured (Test Current 10A DC). The above step to be carried-out until the highest tap. To perform this test, voltage is applied to the low side of the transformer windings with the high-side windings open, which allows the amount of magnetic flux required for operation to flow through the core. This standard applies to all dry-type transformers except instrument transformers, step-voltage and induction voltage regulators, arc furnace transformers, rectifier transformers, specialty transformers, and mine transformers. This test is also used as a baseline for determining the viability of a unit for repair or reconditioning, and it is performed on all 3-phase distribution class transformers. Ensure all concerned personals shall use PPE and all other items as required. In conclusion, dry type transformer testing and commissioning are critical steps in ensuring the proper working and safety of the transformer. The phase relation test confirms that the internal connection of the coils matches the vector grouping diagram on the nameplate of a given transformer. For example, Television sets and stereo equipment, require high voltage where the doorbells and thermostats, insulated wire. This revision does not address transformer requirements and specific test criteria; rather they are contained in appropriate standards such as IEEE Std C57.12.01 or in user specifications. It is known that the I.R. The tolerance from the specified value for two-winding transformers is 7.5%; for zigzag units, autotransformers, and transformers with three or more windings, the tolerance is 10% (IEEE C57.12.00-2020, p. 64, 9.2). Your IP: Labels/Markings Rating Plate Correctness Checks. Up to size, 500KVA transformer is called Distribution transformer. For new factory-built padmount transformers, this test is only required for sizes above 2,500 kVA (IEEE C57.12.00), but Maddox utilizes the winding resistance test for all reconditioned medium-voltage units. The transformer should be connected to the electrical system using appropriate cables and busbars that are rated for the transformer's voltage and current capacity. Therefore the transformer has to undergo this type of test only during manufacturing. voltages will be having approx this proportion. Knowing the complete history of relay tests is critical when inves-tigating transformer-related events. Lastly, if you need to remove dust from your fan blades or transformer windings regularly, install filters at the bottom ventilation ports. Save Money with ELSCO Quality and Service, GE VaporTran Transformer Replacements and Retrofits, Maintenance of Dry Type Transformer While Energized, Maintenance While Dry Type Transformer is De-energized, Checking Dry Type Transformers for Potential Problems or Defects, Preventive Maintenance Checklist for Dry Type Transformer, could be a sign of overheating or a loose connection, unless you think the system has electrical problems, on call to offer you emergency and standard services, Average Lead Times of Padmount Transformers in 2023, The Cost of Transformer Failure in Manufacturing, Guide to Dry Type Transformer Maintenance, 4 Signs Your Dry Type Transformer Needs To Be RepairedFast. It is also a routine IEEE test performed on all newly manufactured transformers. Best Editable Construction QHSE Documentation Portal. The installation location should be well ventilated and away from any sources of moisture, dust, or corrosive gases that could damage the transformer. Winding resistance provides essential diagnostic information, which can aid in evaluating whether a unit is suitable for repair or reconditioning. While power factor testing is not performed under the standard battery of tests required by IEEE C57.12.00 for smaller transformers (generally below 10 MVA), it is required by NETA on all distribution class units. as before. Introduction The primary concern with all transformers (and also the key indicator of life expectancy) is the condition of the insulation system. AET also performs bushing replacement, LTC repairs and oil processing. Measure the voltage at the both Primary and Secondary termination at all the phases. Hence the voltages measured on outer. To understand the basic function of a transformer, you could think of it as a ratio box. AET offers an array of transformer services. Otherwise, you should contact a professional to evaluate and repair the transformer. In the case of lightning, the voltage wave can take a variety of forms. Other, transformers reduce the voltage at the locations where the, electricity is used. Measurement of the transformer's no-load and load losses to verify that they are within the specified limits. IEEE C57.12.00 & IEEE C57.12.90 (Liquid-Immersed)IEEE C57.12.01 & IEEE C57.12.91 (Dry-Type). 23.111.71.92 Examine the insulation and surfaces for discoloration, whichcould be a sign of overheating or a loose connection. . time of measurement should be noted. For this reason, the proper performance of a winding resistance test requires a proficient mechanical knowledge of the internal workings of the transformer, as well as an aptitude for evaluating the available test data. Avoid using chemical cleaners to protect the surfaces of the transformer from damage. For testing the transformer, de-energize the transformer to begin inspection and maintenance. This test uses measurements at 10 minutes and one minute and divides them in a ratio, the Polarization Index (PI) ratio. Until the Equipment is permanently energized, client should ensure that a protective cover will Remain over all the equipment that is being tested. Applied potential testing is designed to fail an insulation system that is already compromised; it is generally agreed that it will not result in damage or failure when performed on a unit with good insulation. Transformer Acceptance Testing and Commissioning Services Proper testing of transformers and related equipment is a critical piece of transformer health and performance. You can email the site owner to let them know you were blocked. side shorted. transformer is to satisfy, to pre-determined standards, that all the transformer is used in generating stations and sub stations at. Remove anything in the area that impedes airflow. values measured, with the Factory results keeping in view, the temperature at the time of measurements. Check. This paper discussed procedures and testing results of, ransformer is a device that transfers electric energy. Check your inbox or spam folder to confirm your subscription. Use of this website signifies your agreement to the IEEE Terms and Conditions.A not-for-profit organization, IEEE is the worlds largest technical professional organization dedicated to advancing technology for the benefit of humanity. The testing Electrical Engineer/Supervisor should confirm the availability of necessary Three Phase AC power supply and Single phase for testing activities. side shorted. This test may be used to confirm the design values for a given unit where a certain number of losses is requested by a customer on a new factory-built unit. The purpose of the No-load test is to measure no-, load losses at a specified excitation voltage and a specified, frequency. Only use dry compressed air. #2. Measurement of the insulation resistance to verify that it meets the specified values. - Damage, paint, cracks checks. TTR (left) and Winding Resistance (right) test sets. To find the calculated ratio, divide the rated primary phase voltage by the rated secondary phase voltage as depicted on the nameplate of the transformer. cover temporary over voltages and continuous service stress. These magnetic fields are all around us, and it is this same principle which is behind the invention of the directional compass. For this test, a voltage is applied and gradually increased between the windings being tested, with the starting voltage being no more than one-quarter of the full value. Test values are provided for all tap positions on reconditioned units. DATE (YYYYMMDD) 7. installations that change the transformer type, the transformers must be marked to show the type of insulating liquid installed and the installations must comply with current requirements of the NEC . The commissioning process should include the following: Visual inspection of the transformer for any signs of damage or defects. Again, Switch off the Supply and repeat the test again by applying the voltage in 1U & 1W and Measure the corresponding voltage for 1U-1V, 1V1W & 1U1W. In the case where a radiator was repaired or replaced, additional care is taken to verify a successful repair that will hold up to usual service conditions in the field. In the same way, a poorly built (or damaged) core assembly will require more heaving and grunting when the transformer is energized. For frequency above twice the rated, frequency the time duration of test shall, are incident to the excitation of the transformer. Phase relation or vector group, verification test is performed on a three phase tra, The phasor diagram of any three phase transformer that, defines the angular displacement and phase sequence can be, verified by connecting the HV & LV leads together to excite, the unit at a suitably low three phase voltage, taking voltage, measurements between the various pairs of leads and then, either plotting these values or comparing them for their, duration of shall be one minute. Tender towards Supply, Installation, Testing and Commissioning of 1.5 MVA (Dry Type) Transformer in IDBI Tower 1 Tender towards Supply, Installation, Testing and Commissioning of 1.5 MVA (Dry Type) Transformer in IDBI Tower 2 INDEX Sr. No. Commissioning Report. No-load current is, the current that flows in any winding used to excite the. The no-load loss determination shall be based on, a sine wave voltage. The average voltage voltmeter method, is the most accurate method for correcting the measured no-, method employs two parallel-connected voltmeters; one is, an average-responding voltmeter; the other is a true rms-, responding voltmeter. Testing voltages: for windings in a grounded wye configuration where the insulation is graded or reduced for applications on grounded systems, the test voltage should be applied based on the lowest insulation level of the tested winding (IEEE Std 62-1995, p.6, section 5.3.3). Apply three phase supply voltage (415 V AC) across the Primary Termination of the Transformer. Method of testing of Transformers: Visual inspection: - Correctness of installation, assembly. &, 11, H.V. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data. Proper installation and commissioning are crucial to ensure the safe and reliable operation of dry-type transformers. For example, if you apply a voltage across H1 and H2 at the primary winding, you would expect to measure a corresponding voltage across X1 and X2 at the secondary winding. Transformers work only with a varying electric current, such as alternating current. If your dry type transformer needs professional service, contact us at ELSCO Transformers. Check your email for a confirmation message. When field test values fall outside what is recommended by NETA, the next course of action should be to perform the remaining battery of standard tests for field commissioning and evaluate the results. variation in line with the details given in name plates. Made By :Mr Marachew Moges, SIWES REPORT 2017/2018 held at TCN Ganmo works center by Taofeeq Olawale SA'AD, S ST TU UD DY Y O OF F 2 22 20 0K KV V S SU UB BS ST TA AT TI IO ON N P PA AS SS SI IA AN NA A( (P PS ST TC CL L, UNITED ARAB EMIRATES FEDERAL ELECTRICITY & WATER AUTHORITY, Power transformers - Part 1: General INTERNATIONAL STANDARD Edition 2.1 2000-04, Disclosure to Promote the Right To Information, IEEE Guide for Diagnostic Field Testing of Electric Power Apparatus Part 1: Oil Filled Power Transformers, Regulators, and Reactors Sponsor Power System Instrumentation and Measurements Committee of the IEEE Power Engineering Society IEEE Standards Board, EE 360 (ELECTRIC ENERGY) LECTURE 01 Introduction to 3 Phase circuits, Question and answers Electrical Maintenance UnitQuestion and answers Electrical Maintenance UnitCT PT CC WATT METER PC Question and answers Electrical Maintenance UnitPresence oxidation, APPLICATION OF SIGNAL PROCESSING TECHNIQUES FOR CONDITION MONITORING OF ELECTRICAL EQUIPMENT, nd Operation of a 4 hiy Stabilized Power S, Power Transformers Principles and Applications. In case one of the phases has shorted turns, it will draw a, observations will indicate the shorted phase. side and measure voltage on the L.V. Verification of the voltage ratio and phase sequence of the transformer. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data. Transformers are important in the distribution of electric power. The test is performed by applying a specified DC voltage through the conductor(s) of the transformer. - Labels/Markings Rating Plate Correctness Checks. Transformers work only with a varying electric current, such, as alternating current. When determining the calculated ratio for a transformer, it is important to refer to the coil (phase) voltagethe phase voltage determines the number of turns at the transformer coils. The action you just performed triggered the security solution. The impedance (%IZ) of a transformer is affected by the resistive (%IR) and reactive (%IX) components of a transformer. Note the. 2). The test time at full voltage shall be 60, seconds for test frequency up to and including twice the, rated frequency. An expert will have the tools and protective gear needed to run this test correctly and safely. Insulation resistance is performed on the high-side windings to low-side windings, high-side windings to ground, and low-side windings to ground. Ideally, use both methods. Ensure that both the Primary and Secondary windings are not connected to any cables/Bus bars. Every two-winding transformer has a ratio. Our goal is to maintain your transformers reliability to the highest standards possible. Also measure and, R losses, to Calculate winding temperature at, the end of Temperature rise test and as a bench mark for, If the winding has tapping, then resistance shall be measured, at all taps otherwise the resistance of each winding shall be, The resistance is measured at ambient temperature and then, relation tests are of interest primarily because of their, relation tests are made to determined angular displacement, and relative phase sequence. It is desirable to do this test by a Ratio-meter. To perform this test, a voltage greater-than-rated volts per turn to the transformer (IEEE C57.12.90-2021, p. 62) is applied and gradually increased for a designated period of time, depending on the frequency at which the test is performed (the frequency supplied must be raised to prevent over-excitation of the core, as the applied test voltage is significantly higher than the rated voltage). Imagine trying to roll a car with a dead battery down the street to a nearby parking lot. A field technician may need to sign off on his end for any values that do not fall within NETAs recommendations, and it may be necessary for Maddox to add clarification or verify that the units test results are within acceptable limits according to factory standards. 2. nidhish57@yahoo.co.in. Insulation resistance testing is used on a variety of electrical apparatus, such as conveyors, motors, fans, refrigerators, HVAC systems, and cables. failure that could include an audible sound such as a thump, or a sudden increase in test circuit current. You do not need to do a Transformer Turns Ratio (TTR) Testunless you think the system has electrical problems. The third stage is the commissioning of the dry type transformer. Factory testing is performed according to IEEE C57.12.00 and IEEE C57.12.90 standards for liquid-immersed distribution, power, and regulating transformers and IEEE C57.12.01 and IEEE C57.12.91 standards for dry-type distribution transformers and power transformers. The action you just performed triggered the security solution. Current projects that have been authorized by the IEEE SA Standards Board to develop a standard. IEEE standards allow a 0.5% variance above and below the calculated value for tested ratios. What are various routine tests conducted on a dry-type of transformer? This test is often omitted in the field for in-service transformers due to the difficulty of achieving the required test voltage levels. Our customers have come to depend on our vast experience and depth of knowledge of power equipment for recommendations and solutions to resolve equipment issues before they result in unplanned power outages or costly equipment failure. Keep in mind that when this test is performed (especially in the field), it is typically done at the bushings of the transformer. Customized bushing gaskets prepared in the field. Measure also the current drawn by the, energized phase. Sorry, you have Javascript Disabled! in this title we describe the method of testing. These losses, change with change in excitation voltage. Over time, the insulation may age or degrade from factors such as overheating, external physical stress, or moisture. At the end of the test, the test voltage shall be rapidly reduced up to 1/3 the full voltage before disconnection. Please include what you were doing when this page came up and the Cloudflare Ray ID found at the bottom of this page. The first stage is pre-commissioning testing, which includes visual inspection, insulation resistance testing, and winding resistance testing. Type of transformer testing methods. Testing and protection of transformer Seminar Guide Seminar Coordinator, IEEE Standard Test Code for Liquid-Immersed Distribution, Power, and Regulating Transformers, LABORATORY MANUAL of ELECTRICAL MACHINES II, Power transformers Part 3: Insulation levels, dielectric tests and external clearances in air, Electrical Power Equipment Maintenance and Testing - 2nd Edition, Technical Specification for 33/11kV Power Transformers, A Case Study on FRA Capability in Detection of Mechanical Defects within a 400MVA Transformer, ELECTRICAL MACHINES LABORATORY MANUAL BASIC ELECTRICAL MACHINES [ECEg132] LABORATORY MANUAL INSTITUTION OF TECHNOLOGY Department of Electrical and Computer Engineering SUPERVISOR: EE Deptt. Measure the secondary (LV) voltage at the LV termination. 25 Forbes Blvd, Suite 1, Foxboro, MA 02035 During functional testing, the transformer is energized and operated at rated voltage and frequency, and the readings are taken for amps, volts, and watts. While cleaning the transformer, look for rust on the clamps and/or core steel, any carbonization or tracking on the windings and/or insulation. ACSD test is always, the whole application of test. College, Gujarat, India, equipment erection is correct and that all the equipment, connections / cables have been installed in accordance with the, approved erection drawings and diagrams. Note the, observations in commissioning Report. After completion of testing work the Testing Engineer will obtain the signature of relevant officials: Consultant. We offer the following services for medium voltage transformers: For transformer repairs or replacements,contact usat ELSCO Transformers. In addition to the above transformer testing methods, the power transformer also goes through some other tests, performed on it, before . In summary, the installation and commissioning of dry-type transformers require careful planning and execution to ensure their safe and reliable operation. Look for dust or dirt accumulation on the surfaces of the transformer. Due to the design of distribution class transformers, test results can yield inconclusive values and may puzzle a field technician who is used to meggering stand-alone cables in a raceway.